Quantcast
Channel: SCN : Document List - Enterprise Asset Management (SAP EAM)
Viewing all articles
Browse latest Browse all 842

Material Availability Check in Maintenance Order

$
0
0

Material Availability Check in Maintenance Order

 

The purpose of this document is to provide detail information on setting up the material availability check in SAP Plant Maintenance for stock Materials.

 

Material Availability check in the maintenance order is one of the useful functionality provided by SAP. When we plan materials in the maintenance order, you can either check the availability before the order is released or the system can do it automatically when the order is released. Material Planning is one of the important KPI’s for planning team.

 

Pre-requisites

  1. Plant Maintenance Configuration
  2. Material Master data Maintenance


Plant Maintenance Configuration

 

1. Define Checking Rules

 

     Plant Maintenance and Customer Service - Maintenance and Service Processing - Maintenance and Service Orders - Functions and Settings for Order Types - Availability Check for Material, PRTs, and Capacities - Define Checking Rules


Pic 1.jpg

2. Define Scope of Check

 

     Plant Maintenance and Customer Service - Maintenance and Service Processing - Maintenance and Service Orders - Functions and Settings for Order Types - Availability Check for Material, PRTs, and Capacities - Define Scope of Check

 

For Individual Requirements


Separate requirements will be generated for each order.

Pic 3.jpg

This document will deal only with Availability Check 02 (Individual Requirement)

 

3. Define Inspection Control

 

     Plant Maintenance and Customer Service - Maintenance and Service Processing - Maintenance and Service Orders - Functions and Settings for Order Types - Availability Check for Material, PRTs, and Capacities - Define Inspection Control

 

This configuration needs to be done with a combination of Plant / Order type / Availability Check

 

Check availability during order creation

 

Pic 12.JPG

* Check material availability when saving order

* Assign the Checking rule created in Step 2

* Collect. Conversion is used to determine the action you want to do in case of Material not available. This will not be relevant when then Order is in creation phase

 

Check availability during order release

Pic 16.JPG

If Status Check is used, an availability check does not have to run ever time an order is released. This reduces the system load. (SAP help)


4. Define Change Documents, Collective Purchase Requisition, MRP relevance


This configuration plays a vital role on checking the Material Availability in SAP PM.

Pic 9.JPG

You need to make sure Res / Pur Req is set Immediately, else during Work Order Creation, Material availability check will not work.


Material Master data Maintenance

 

Availability check needs to be maintain for the Material in MRP3 view.

pic 8.JPG

Availability Check 02 is maintained for the Material.


Case 1 : Check availability during Order creation

             

Scenario 1: Before Saving the Work Order


A work order creation in progress, after entering the Material availability icon highlighted below will give the pop-up "Non-Availability of Material See log"

Pic 13.JPG


System Status MSPT - Material Shortage will be updated.


Click the Log icon to see the messages

Pic 14.JPG


Click the Display log in Total to view all messages

Pic 15.JPG


Please make a note, this will not stop you on saving the Work Order in CRTD status.


Scenario 2: After the Work Order is saved


Material Availability was not checked manually

Pic 17.JPG

During creation System Status is set as MANC (Material Availability not checked)


After saving the Work Order

Pic 19.JPG

System Status MSPT (Material Shortage) is set automatically on save.


Work Order can be reviewed using System Status itself

 

Case 2 : Check availability during Order release

             

Scenario 1: Define Inspection Control - User decides on release  if parts are missing


When the Order is created, material planning is done and saved. Upon clicking the release flag, system gives below message

Pic 20.JPG

Based on the configuration, user have authority to bypass and release the order.

 

Click on Missing Parts List icon

Pic 21.JPG

Scenario 2: Define Inspection Control - No release if parts is missing


When the release flag is clicked, system pop-up below error message

Pic 22.JPG


In this configuration setting, you cannot release the work order, to check the log click Go to - Logs - Release


Pic 24.JPG

Pic 25.JPG

Click on Display log icon in Total to view all messages

Pic 26.JPG


This document is prepared based on the default configuration, explore more on the config for different kinds of scenarios.



Viewing all articles
Browse latest Browse all 842

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>